Allowance Reality Check

Allowances are often one of the biggest sources of budget overruns on custom homes — not because of bad intentions, but because they are typically set months before selections are made.

Select a finish grade for each category, then optionally enter what your contract actually sets. The ranges here reflect what selections at each grade realistically cost in this market — including the high end, because that is often where projects land.

Project dimensions

Bathrooms3 baths
Tile & Stone Area600 sq ft
Hardwood Area3,500 sq ft

Select a finish grade for each category — then optionally enter your contract allowance

Kitchen Cabinets & Millwork

Includes upper/lower cabinets, island, pantry, and trim details

Kitchen Appliances

Range/cooktop, refrigeration, dishwasher, oven — package pricing

Countertops

Kitchen, island, wet bar, and secondary surfaces

Plumbing Fixtures

Per bathroom — faucets, shower systems, tub, toilet, accessories

Range shown per bath × 3 baths

Tile & Stone

All wet areas — showers, floors, backsplash. Per square foot installed

Range shown per sq ft × 600 sq ft

Hardwood Flooring

Material and installation per square foot

Range shown per sq ft × 3,500 sq ft

Lighting & Electrical Fixtures

Decorative fixtures throughout — excludes recessed/structural lighting

Interior Doors & Hardware

All interior doors, hinges, passage sets, and specialty hardware

Primary Bath Finishes

Full finish package — vanity, fixtures, tile, hardware, mirrors, accessories

Select a grade for any category above to see the range.

Allowances are estimates

Every allowance in a contract is a placeholder. The real number does not exist until selections are made — sometimes a year into the project.

Grade is set by taste, not budget

Owners at the same price point often make very different selections. Grade reflects your design direction, not the contractor's default.

Gaps compound

A $30k shortfall across four categories is $120k in change orders. Early review prevents late surprises.